Work in progress on the new moorings above the bridge in Killaloe.
Below the bridge, the downstream end of the canal has been blocked by a fallen tree. The ESB boats (62M and the tug) have been moved to the dockyard side (I don’t know whether that has anything to do with the blockage) and the path down the side of the marble mill has been blocked by a locked gate. It is climbable, but being burdened I did not attempt it.