The installation of the new pontoon, the flood control gates (flash lock) and the walkway continues apace.
Boats mooring on the lower end of the pontoon, and turning to approach upstream, may get quite close to the bridge. The navigation markers may confuse too: perhaps they’ll be relocated.
It all looks very nice. There are lots of people working on site.