The Corrib dredger

Drainage and Navigation Works: Construction of dredging machinery

The Commissioners having authorized the purchase of one of the iron dredgers used in the execution of the Shannon works, and then on that river at Athlone, the operation of removing her to Galway was commenced on 1st of March.

This was effected by first clearing her of all machinery, and then cutting up the hull or shell into pieces suited for carriage by land, in which manner every portion of her was removed to Galway.

In reconstructing this boat, considerable improvement and thorough repairs have been effected. A flat iron plate, three-fourths of an inch thick, has been substituted for the hollow iron keel, which lightens her draft of water five inches without any diminution of her steadiness, and an alteration of the position of the steam-pipes has been judiciously arranged. The keelsons were pieced, and whenever any materials were unsound they have been replaced.

The time occupied in the breaking up, transfer, and reconstruction of this dreder, weighing 200 tons, was five months and eleven days, and the whole work was executed at a cost of £803/8/11.

Four scows or decked barges have been constructed for the conveyance of the material raised by the dredger to spoil. Two of these boats are capable of carrying 30 tons, and the other two 45 tons.

Extract from the Annual Report of Mr S U Roberts CE, District Engineer for the year 1851 in Twentieth Report of the Commissioners of Public Works 1852