Category Archives: Extant waterways

Shannon traffic

This chart shows the numbers of Shannon lock and bridge passages for the first ten months of the year for ten years from 2003 through 2012.

Figures courtesy of Waterways Ireland

These figures take no account of boats that do not use locks and bridges, eg those that remain on lakes.

The decline continues.

WI finances

Robin Evans, chief executive of the Canal & River Trust, was interviewed in the December 2012 issue of Waterways World. CART, a charitable trust, has taken over from British Waterways in England and Wales, but not in Scotland.

Robin Evans pointed out in the interview that, whereas waterways in Scotland get 98% of their funding from the state, CART’s English and Welsh waterways get only 35%. Amongst other things, CART is seeking donations and getting people to volunteer as lockkeepers and in other roles.

I’ll bet the Irish government is looking on with interest.

Boats to return to Corbally Branch

Well, canoes, but better than nothing.

PS for “upstream” read “downstream”, as far as I can see.

Waterways Ireland and the cuts …

WI’s tree-cutting on the Barrow.

Royal water (current status)

I have updated my page about Royal Canal feeders with some information provided by Nigel Russell of WI to the An Bord Pleanála oral hearing on the Royal water supply scheme.

Incidentally, the Department of Arts, Heritage and the Gaeltacht, WI’s parent department in RoI, was among the (few) objectors to the proposed abstraction of water from Lough Ennell, although it was in favour of ceasing to abstract water from Lough Owel [Inspector’s report pp11–12]. Indeed it seemed to have some reservations about the reopening of the Royal Canal, not on economic grounds but because “some important nature consideration issues need to be fully addressed”.

Royal water

The Royal Canal water supply applications have been approved by An Bord Pleanala. There were two separate applications [see here and here] but they were in effect treated as one. There are five PDFs available on each page and I haven’t read all of them yet. However, on a first glance, I note that:

2. The proposed development shall be operated as follows:

(a) Rates of abstraction from Lough Ennell to the Royal Canal shall be as specified  in the public notices and, in particular, shall not exceed 43,636 cubic metres of water in any 24 hour continuous period and subject to a total maximum abstraction of 6,586,363 cubic metres per annum.

(b) Abstraction from Lough Ennell to supply the Royal Canal shall cease when the  lake level reaches 79.325 mOD Malin Datum, being the crest level of Clonsingle weir, measured at Clonsingle weir by continuous monitoring.

(c) The fish pass at Clonsingle weir shall incorporate a minimum flow of 0.29m3/second.

(d) A minimum flow of 682 m3/day (0.5MGD), taken directly from Lough Owel, and excluding water from the fish farm, shall be retained in the original canal feeder.

Reason: In the interest of protecting the integrity of the Lough Ennell Special Area of Conservation and the ecological interest of the River Brosna and the canal feeder, and in the interest of protecting material assets at Lough Ennell and the River Brosna.

If I remember correctly, the amount of water available from Lough Ennell will not always provide enough (eg in a dry season) to keep the canal full. Still, this is a significant advance for Waterways Ireland and for Royal Canal enthusiasts.

Preparing for winter

WI at work in Killaloe Novemebr 2012.

Old crane being painted

 

The Marindus weedspraying pontoon. This Marindus may be Marindus Engineering Ltd of Kilmore Quay, Co Wexford

Keeping a clean bottom

The upper chamber at Ardnacrusha lock

WI canal permits

Latest update here. These are the main points.

Process

Applications for extended mooring permits at nine new locations will be available for two weeks from 19 November to 3 December 2012. The locations are Rathangan and Vicarstown on the Barrow Line (with a third stretch now at Vicarstown), two at Confey and one each at Cloondara and Lock 15 on the Royal and just one, Lock 34 to Griffith Bridge, on the Grand.

The schedule:

Applications for each set of locations are open for two weeks. Completed applications will be processed in order of receipt and mooring locations allocated. If availability exists after the application timeframe for a location has closed, late applications may be considered. Once all the extended mooring locations in an area have been allocated, no more extended mooring permits will be issued for that area in 2013. It is Waterways Ireland’s intention to complete the roll out of the extended mooring permit by March 2013.

That seems to be intended to get boaters to apply ASAP; otherwise they’ll be moored in the middle of nowhere for the rest of 2013.

The application process is set out in detail, with a new item.

From 16 November 2012 permits will no longer be issued by Lockkeepers, or the Eastern Regional Office. Permits will only be issued on completion of an application form submit to and processed by the Tullamore Office.

It is confirmed that applications must be accompanied by “copies of the insurance, and payment for the permit and a damage deposit”.

Downloads

There are four downloads: the application form [DOC] and a supplementary form for consortium members [also DOC], a sample 11-page EMP licence [not permit] agreement [PDF] and a 5-page guidance document [PDF]. A consortium is defined in the guidelines as a group of more than two people who own a single vessel. Owners of unpowered vessels are advised, but not required, to have insurance.

waste

The guidelines have a new item about disposing of rubbish:

Boat owners on the canals will be required to dispose of domestic rubbish at  their own expense. On the application form you need to indicate how you intend to manage this. For example, evidence of a paid collection service or by confirming that you will take your rubbish home and dispose of it through your domestic collection service.

In a limited number of locations Waterways Ireland may offer this service for a charge. Details of this will be notified when the area opens for extended mooring permit applications.

That is as I predicted in the last issue of Afloat.

And there is a paragraph about holding-tanks:

You are asked to tell us if your boat has an operational waste holding tank.  This is not a mandatory requirement, but information is being collected for management purposes.

The licence agreement says that owners have to clean up after dogs.

Here comes the BSC

From 2015 Waterways Ireland will be introducing the requirement for boats needing permits and wishing to use the canals to have a current hull survey to provide evidence that the boat is in good condition.

Not all boats will require this.

Your attention is being drawn to this requirement now to allow you time to prepare for 2015.

That’s from the guidelines document (join the queue now for the dry docks). And these bits are from the licence agreement:

The Licensee undertakes to have regular inspections of the gas and electric services of  his Boat as required to ensure these are kept in a safe and serviceable condition. […]

All Boats must carry adequate fire fighting equipment and have same serviced as per the manufacturer’s recommendations.

Insurance

The application form requires applicants to agree to this:

I/We hereby indemnify and shall keep indemnified Waterways Ireland from and against all actions proceedings costs claims demands and liabilities howsoever arising from my/our use of the facilities provided by Waterways Ireland on the Royal Canal, Grand Canal and Barrow Navigation and shall further indemnify and keep indemnified Waterways Ireland in respect of any accident, injury, loss or damage to any person or property howsoever arising including, without prejudice to the generality of the foregoing, where such accident injury loss or damage arises by reason of any matter or thing done or omitted to be done by me/us or person authorised by me/us or the purported exercise of such use.

I would welcome guidance on whether that might invalidate insurance policies.

Moorings are not transferable

If a Boat is sold it must be removed from the Mooring within seven days and the  Licensee must advise the Licensor’s Inspectorate. The new Boat owner will be required to make an application if they wish to avail of an extended mooring permit and Waterways Ireland will refund the balance pro rata of any fee paid for an extended mooring permit to the Boat owner less a fee of €50 to cover administration costs.

That’s from the draft licence.

Buy shares in Lowtown

Also from the draft licence.

It is not permitted to re-fuel Boats at an extended mooring.

Lots of exciting reading.

Spencer Dock

The Royal Canal meets the River Liffey at Spencer Dock (more or less: older OSI maps suggest that the section between Sheriff Street and the Liffey is Royal Canal Docks, with Spender Docks north of Sheriff Street). Much development has been proposed, and perhaps undertaken, in the area, where CIE (the public transport authority) owned much land.

Now, the Sunday Business Post tells us [perhaps behind a paywall], CIE’s subsidiary Irish Rail, which runs railways, is to sell land at Spencer Dock to a “private sector buyer”. The proceeds will enable Irish Rail to get rid of another 120 workers: it planned to lay off 300 workers this year but only 89 left because Irish Rail could not afford the terms of a voluntary redundancy scheme. The departures will reduce its wage bill.

I don’t really understand why CIE doesn’t simply shut down Irish Rail altogether, with the possible exception of the Dublin commuter services. Even its main-line trains are surely unnecessary now that most major conurbations are linked by motorways, on many (if not all) of which Bus Éireann, another subsidiary of CIE, runs express services. Lunatic ideas like the Western Rail Corridor don’t help, of course, but when, as the SBP reports,

[…] a train was recently left stranded in Galway after a local supplier refused to provide further credit […]

and when the company (again according to the SBP) cannot afford toilet rolls or receipt rolls for credit card machines, it may be that the market is trying to give the owners of the business a message: “close down now”.