Tag Archives: Killaloe

Date

Killaloe & Ballina are having one of Waterways Ireland’s Discover Days on Sunday 29 April 2012.

Includes “visitor attractions, water activities, arts and crafts, face painting, live music, a historical walking tour, boat trips and other land and water activities”.

More info as it becomes available.

Limerick dredging

The Limerick Post has news here.

Killaloe bridge

More on the new bridge here with the full public notice here [PDF]. Interesting to see how many of the names of landowners are known to me.

I see on page 6 of the notice that the ESB owns two rivers, which are occupied by the ESB, Waterways Ireland, the Inland Waterways Association of Ireland and other unknown persons. There is a canal, whose owners are unknown, which is occupied by WI, IWAI and the persons unknown, as is an island. I do hope that the council will return the canal, rivers and island when they’ve built the bridge.

Killaloe and Ballina

Nice to see they’re going to get a Discover Day.

Limerick bridge

Just as Killaloe is to have a new bridge, so too is Limerick. Or perhaps more than one …. This page (on a site whose ownership I do not know) has a map of proposed routes for the proposed Limerick Northern Distributor Road, which is to provide a northern bypass of Limerick. You can read about it on the websites of the promoters, Limerick County Council, Clare County Council and Limerick City Council. You can download stuff. And you will be pleased to hear that there are to be consultations (only not many of them).

This road is to be built in two phases, the first covering the area from west of the city to Parteen and the second from there to the old Dublin road (N7 as was, now demoted to the status of boreen). There are (or were) several options for each section, but the decision to cross the navigation at the Ardnacrusha tailrace, between the power station and the existing bridge, seems to be set in, er, concrete: that is, it seems, where the ESB wants it.

Ardnacrusha and the tailrace seen from the existing bridge at Parteen

The current consultation is about Phase 2, south-east from Parteen. There are several possible routes.

Two of them, B1 and B2, would cross the Shannon downstream of Plassey and the Black Bridge; they would not cross the Plassey–Errina Canal. It would be important to ensure that they did not further damage the towing-path and its artefacts on the Limerick side.

The west bank below Plassey

Four other routes — C1, D1, D2 and E1 — would cross the Plassey–Errina Canal between Gillogue and Wooden Bridge; they would cross the non-navigable Shannon upstream of Plassey, between there and a point just above the confluence of the Mulcair. C1 seems to run very close to Gillogue Lock, although that may be an effect of the scale of the route markings.

Woodenbridge (which isn't)

I am sure that the ESB will look after the interests of the existing navigation (through Ardnacrusha) and that Waterways Ireland will look after those of the former navigation (the river to Plassey and the canal thence to Errina). However, it might be worthwhile lobbing in a comment to TPTB, first to sttress the heritage value of the abandoned navigation and second to suggest that a new road near Plassey might improve rather than diminish access to that area.

One final thought: this new road seems likely to put the final nail in the coffin of the Limerick Tunnel under the Shannon estuary downstream of Limerick. I very much enjoy using the tunnel, but many folk are deterred by the charges and they drive through the city instead — or, worse, cross the Shannon at O’Briensbridge. As a result, revenue is less than expected, so the traffic guarantee mechanism means that the National Roads Authority has to compensate the tunnel operators.

So now that a new, free, presumably fast road is to link the east and west sides of the city, what will happen to the numbers of vehicles using the tunnel and to the taxpayers who are ultimately paying the compensation? They’ll pay more. The tunnel is on a national primary route, so it’s the NRA’s problem, whereas the new bypass is a regional or local route, which is in the hands of the local authorities.

 

 

 

=p-po-

Killaloe bridge

The Irish Times tells us that the proposed new bridge at Killaloe will be built. The preferred route would cross the canal at Moys, below the breach in the wall,  and, on the Tipperary side, feed into the existing roundabout at the junction of the R494 and R496.

The Preliminary Design Report for the project said:

There is an existing canal alongside the river on the west side, which served a navigational function up to the time of the construction of the Parteen Weir and the raising of the water level in the river. The canal is now inundated by the river as a result of the raising of the water level, and now merely forms a parallel channel alongside the river. A strip of land some 25m wide separates the river from the canal, which is approximately 10m to 12m wide at the bridge site. As the river is now fully navigable, the canal serves no navigational function except that recreational vessels wishing to access properties on the western shore can only do so by entering the canal through certain access points, and travelling along the canal to their desired destination on the shore.

It seems that Waterways Ireland (god bless ’em) insisted that the canal remain navigable:

[…] Waterways Ireland have now requested that passage along the canal be retained, and have advised that they intend to refurbish the canal as a recreational amenity.

A culvert is therefore to be built over the canal, but not a low-level culvert:

[…] Waterways Ireland require that the structure provide a minimum of an 8 metre wide waterway with a 4 metre wide towpath for vehicle and pedestrian access. They require the provision of a minimum headroom of 3.86 metres above normal water level, and a bed level not higher than the downstream cill of the canal lock at Killaloe/Ballina Bridge.

The section of canal will be dewatered during construction work.

These quotations are from Shannon Bridge Crossing Preliminary Design Report Rev F01 by RPS Consulting Engineers in October 2006. I am unable to find, on the Clare County Council website, any later documents that might assure me that the canal crossing provisions still apply. That’s not to say that they don’t; it may just be that the Council doesn’t think citizens need up-to-date information on the matter.

 

Annoying the neighbours

It would be unfair to condemn the proposed opening of a canal to Clones without also condemning the proposed reopening of the Park Canal in Limerick (and the Newry, when I get around to it). The link is to a top-level page; the first substantive page has a lead to the second, the second to the third and so on up to the fifth.

The Limerick Navigation

As a preliminary to increasing coverage of the old Limerick Navigation, I have improved the section’s top-level page. I added maps of the separate sections of the navigation and distances (in eighths of miles) from Prothero and Clark.

 

SS John Randolph

The SS John Randolph, described as “America’s first successful iron ship in commerce”, is commemorated by a historical marker in Savannah, Georgia, USA.

The John Randolph was one of the first six iron vessels built by Lairds of Birkenhead (later merged into Cammell Laird). The other five were built for use on the River Shannon.

Lough Derg 1839

Drawings now uploaded. Much more activity in these than in the Lough Ree equivalents, with steamers towing barges, turf boats, the surveyors’ cutter and other excitements.