Tag Archives: irish water

Garryowen and the Royal Canal

The shortage of water for the Royal Canal has been covered a few times on these pages with pieces about its feeders in general, the Lough Owel feeder in particular and the proposed replacement supply from Lough Ennell.  Last I heard, the Lough Ennell proposal had become a matter for Irish Water rather than for the local authority, which sent the whole thing back to the drawing-board but if, Gentle Reader, you have more recent information, do please leave a Comment below.

A recent post about the inadequacy of back-pumping from the Inny led to a discussion in the Comments, from which it became plain that the Lough Owel feeder was well below normal levels and that the water supply to Mullingar, never mind that to the canal, was seriously inadequate. I was prompted to suggest that one of these might be the best type of boat for the Royal.

But I see from the blatts that the seventh cavalry, in the shape of Irish Water (whistling Garryowen, of course), intends to take water from Lough Ree to supply Athlone, Mullingar and Moate.

Perhaps there will be some to spare for the Royal Canal.

Cussane lock

Cussane or Coosaun Lock was the lowest of three on the Killaloe Canal, which was the uppermost section of the Limerick Navigation. It was a double lock or “staircase pair”.

Cussane Lock (OSI ~1900)

Cussane Lock (OSI ~1900)

 

You can see what the lockkeeper’s house looked like in 2015 in the article “A Flooded Landscape Revealed“, written by folk who surveyed the area last year for Irish Water.

My OSI logo and permit number for website

Hard sums on Lough Derg

According to the Clare Champion, a Clare county councillor called Pat Hayes, who is a member of Fianna Fáil [an excitable lot, Fianna Fáil], is boycotting something or other for some reason that is not clear to me [and, to be honest, is probably entirely unimportant]. Mr Hayes thinks that water from Lough Derg should be sent to the Atlantic, where it is wasted, rather than to Dublin, where it might be used, and the newspaper cites the River Shannon Protection Alliance as estimating that

… up to 350 million litres of water could be taken from Lough Derg by 2030.

The River Shannon Protection Alliance itself doesn’t agree with those figures. It says:

The central principal and immediate purpose of the organisation is to prevent the proposal of Dublin City Council to abstract in excess of 350 million litres of water on a daily basis from Lough Ree on the river Shannon, and to oppose any action that may be harmful to the well being of the river Shannon system. Since then, the abstraction options have been considered and the current recommended proposal is to abstract upwards 500 million litres of water from Lough Derg and store it in a depleted bog hole to be developed by Bord na Móna at Garryhinch bog, (near Portarlington) where the water will then be treated and pumped on to Dublin.

Eek. That’s a bignum: a lot of litres. Let’s all panic.

On the other hand, 500 000 000 litres is 500 000 cubic metres. Each of Ardnacrusha’s four turbines uses 100 cubic metres per second. So the amount of water to be sent to Dublin every day is less than Ardnacrusha uses in 21 minutes.

If the Alliance wants to save the Shannon, shouldn’t it be trying to get Ardnacrusha closed down first?

Royal Canal water supply

On 26 November 2012 I noted that

The Royal Canal water supply applications have been approved by An Bord Pleanala. There were two separate applications […] but they were in effect treated as one.

There were conditions attached, but I concluded that

If I remember correctly, the amount of water available from Lough Ennell will not always provide enough (eg in a dry season) to keep the canal full. Still, this is a significant advance for Waterways Ireland and for Royal Canal enthusiasts.

So here we are, almost two years later, and the work of providing a supply from Lough Ennell to the Royal Canal, reckoned to be about a five-month job, has doubtless been long completed, no?

No.

The work has not yet started and Waterways Ireland will be lucky if it gets done within the next year.

As I understand it — and if, Gentle Reader, you have more information, do please leave a Comment below (your name can be kept out of public view if you like) — there are three sources of delay:

  • first, I understand that there is a technical issue about one of the conditions attached to the approval; it is felt that the condition is unworkable, but that getting it changed might take some time. I presume it’s one of the conditions 2(a) to 2(d) that I quoted two years ago and, looking at the proposed orders published in the press [PDF], I suspect it might be the requirement to maintain the lake level at or above 79.325 mOD Malin Datum. However, I don’t really know
  • second, Waterways Ireland took over Clonsingle Weir, at the outlet from Lough Ennell, by Compulsory Purchase. Owners of mills, who generate electricity from the Brosna, have submitted claims for compensation. I understand that an arbitration hearing, lasting four days, is scheduled to be help in May 2015
  • third, responsibility for the scheme has moved from Westmeath County Council to Irish Water. Which may have other things on its mind.

Irish Water has published its proposed Capital Investment Programme [PDF] but Appendix 1, the Investment Plan Project Summary, is in a separate file [PDF]. Category B is headed Review Scope and Commence Construction and it includes

Mullingar Regional Water Supply Scheme (G) … Lough Ennell Abstraction.

I can’t work out what “(G)” means. A few items are so marked; a few others are marked “(H)”; most items have neither.

The Capital Investment Programme [CIP] document says:

 The CIP is dominated by contractual commitments entered into previously by Local Authorities, and which have now transitioned to Irish Water. In the 2014-2016 period, Irish Water will fund these contracts to completion and bring forward programmes and prioritised projects to commence. At the same time, it will progress a large portfolio of projects that are at the planning and design stage, reviewing their scope, budgets and, where appropriate, timing to favour maximising the performance of the existing assets through intensified capital maintenance that might allow deferral of major capital investment.

Emphasis mine. So that raises the possibility that Irish Water will decide not to fund the abstraction scheme but will rather opt to pay for continued pumping.

It is, of course, quite possible that I have misunderstood these difficult matters, so I will be glad to hear from anyone with better information.

Incidentally, reviewing Irish Water’s documents suggests to me that there are people there who know what they are doing and who have the expertise to manage large and complex operations. That differentiates them from the politicians in government and opposition, few of whom (as far as I can see) have any experience of running anything more complex than a parish social.

 

 

Lowering Lough Derg

Boat-owners concerned about high water levels on Lough Derg will be glad to know that relief is in sight, although it may take a little while to arrive. Irish Water has taken over the project to send Shannon water to Dublin and is procuring something, although it is not at all clear what that is. The, er, news item is so far leading in the competition for least informative press release of the year.