Tag Archives: lock

Preparing for winter

WI at work in Killaloe Novemebr 2012.

Old crane being painted

 

The Marindus weedspraying pontoon. This Marindus may be Marindus Engineering Ltd of Kilmore Quay, Co Wexford

Errina

Waterways Ireland has parked a canteen trailer and some pontoons at Errina Bridge.

The compound, with Official Notices signed Rabbit

Pontoons

The canteen trailer

 

Another view of the canteen trailer

Evidence of tree cutting above Errina Lock, but that may not have anything to do with Waterways Ireland

The guardians of the lock

 

Keeping a clean bottom

The upper chamber at Ardnacrusha lock

WI canal permits

Latest update here. These are the main points.

Process

Applications for extended mooring permits at nine new locations will be available for two weeks from 19 November to 3 December 2012. The locations are Rathangan and Vicarstown on the Barrow Line (with a third stretch now at Vicarstown), two at Confey and one each at Cloondara and Lock 15 on the Royal and just one, Lock 34 to Griffith Bridge, on the Grand.

The schedule:

Applications for each set of locations are open for two weeks. Completed applications will be processed in order of receipt and mooring locations allocated. If availability exists after the application timeframe for a location has closed, late applications may be considered. Once all the extended mooring locations in an area have been allocated, no more extended mooring permits will be issued for that area in 2013. It is Waterways Ireland’s intention to complete the roll out of the extended mooring permit by March 2013.

That seems to be intended to get boaters to apply ASAP; otherwise they’ll be moored in the middle of nowhere for the rest of 2013.

The application process is set out in detail, with a new item.

From 16 November 2012 permits will no longer be issued by Lockkeepers, or the Eastern Regional Office. Permits will only be issued on completion of an application form submit to and processed by the Tullamore Office.

It is confirmed that applications must be accompanied by “copies of the insurance, and payment for the permit and a damage deposit”.

Downloads

There are four downloads: the application form [DOC] and a supplementary form for consortium members [also DOC], a sample 11-page EMP licence [not permit] agreement [PDF] and a 5-page guidance document [PDF]. A consortium is defined in the guidelines as a group of more than two people who own a single vessel. Owners of unpowered vessels are advised, but not required, to have insurance.

waste

The guidelines have a new item about disposing of rubbish:

Boat owners on the canals will be required to dispose of domestic rubbish at  their own expense. On the application form you need to indicate how you intend to manage this. For example, evidence of a paid collection service or by confirming that you will take your rubbish home and dispose of it through your domestic collection service.

In a limited number of locations Waterways Ireland may offer this service for a charge. Details of this will be notified when the area opens for extended mooring permit applications.

That is as I predicted in the last issue of Afloat.

And there is a paragraph about holding-tanks:

You are asked to tell us if your boat has an operational waste holding tank.  This is not a mandatory requirement, but information is being collected for management purposes.

The licence agreement says that owners have to clean up after dogs.

Here comes the BSC

From 2015 Waterways Ireland will be introducing the requirement for boats needing permits and wishing to use the canals to have a current hull survey to provide evidence that the boat is in good condition.

Not all boats will require this.

Your attention is being drawn to this requirement now to allow you time to prepare for 2015.

That’s from the guidelines document (join the queue now for the dry docks). And these bits are from the licence agreement:

The Licensee undertakes to have regular inspections of the gas and electric services of  his Boat as required to ensure these are kept in a safe and serviceable condition. […]

All Boats must carry adequate fire fighting equipment and have same serviced as per the manufacturer’s recommendations.

Insurance

The application form requires applicants to agree to this:

I/We hereby indemnify and shall keep indemnified Waterways Ireland from and against all actions proceedings costs claims demands and liabilities howsoever arising from my/our use of the facilities provided by Waterways Ireland on the Royal Canal, Grand Canal and Barrow Navigation and shall further indemnify and keep indemnified Waterways Ireland in respect of any accident, injury, loss or damage to any person or property howsoever arising including, without prejudice to the generality of the foregoing, where such accident injury loss or damage arises by reason of any matter or thing done or omitted to be done by me/us or person authorised by me/us or the purported exercise of such use.

I would welcome guidance on whether that might invalidate insurance policies.

Moorings are not transferable

If a Boat is sold it must be removed from the Mooring within seven days and the  Licensee must advise the Licensor’s Inspectorate. The new Boat owner will be required to make an application if they wish to avail of an extended mooring permit and Waterways Ireland will refund the balance pro rata of any fee paid for an extended mooring permit to the Boat owner less a fee of €50 to cover administration costs.

That’s from the draft licence.

Buy shares in Lowtown

Also from the draft licence.

It is not permitted to re-fuel Boats at an extended mooring.

Lots of exciting reading.

The Park Canal

I wrote here about the Park Canal and why it should not be restored. I did not include, because I had not then seen it, a link to this report in the Limerick Post. It shows why the gates on the second lock were not replaced. The core problem is that the banks in the upper section of the canal slope too steeply to be stable.

The slope of the banks above the railway bridge (from a boat)

Happily, this deficiency in the original construction has saved us from another foolish restoration.

 

Eeyore’s Gloomy Place

Here is an article, perhaps by Philip Dixon Hardy himself, from his Dublin Penny Journal of 1835. It is about the Bog of Allen, and the turfcutters living thereon, seen from the Grand Canal in 1835.

He visited a turfcutter’s hovel in the bog while stopped at a double lock about twenty miles from Dublin. What lock could that have been?

Note that Kildare is not among the counties mentioned in the article.

WI extended mooring permits

A Waterways Ireland press release has winged its way to my desk. If you want a permit (or licence?) you must provide a copy of your insurance and pay a damage deposit.

The full thing:

Waterways Ireland announced in June 2012 a change in the permit system allowing for year-long mooring permits on the Grand & Royal Canal and Barrow Navigation. The full list of Extended Mooring Locations has been published and is available on www.waterwaysireland.org, in the Canal Bye-Law Enforcement section.

The first four [for certain values of four. bjg] locations where the permits for extended mooring are being opened for application are Shannon Harbour on the Grand Canal, Rathangan and Vicarstown on the Barrow Line and Barrow Navigation, Clondra (East of Richmond Harbour), Confey and the 15th lock on the Royal Canal.

The application process for the Extended Mooring Permit for these locations will open on the 19th November and will remain open for 2 weeks. Boat owners with boats in the four locations with Combined Mooring and Passage Permits will be advised by letter. The Application Form and Guidance Notes for all applicants will be placed on www.waterwaysireland.org. The applicant is required to complete an application form, supply a copy of their insurance, certify that the boat complies with the byelaws and pay the €152 fee and a damage deposit of €250.

Permits will be allocated on a first come first served basis, so to receive a preferred location early applications are advised. Applications will only be accepted from owners already holding a valid annual Combined Mooring and Passage Permit. Boat owners without a Combined Mooring & Passage Permit who wish to apply for an Extended Mooring Permit can do so by ticking the box on the Extended Mooring Application Form and supplying the additional fee.

Applicants will be notified within 28 days of the success of their application.  Successful applicants will be required to sign the Extended Mooring Permit license and will then have a period in which to move to their new mooring. Enforcement of the 5 day rule will begin in this area following the issue of a Marine Notice.

Applications for the next set of Extended Mooring Locations will continue on a rolling basis thereafter with Waterways Ireland intention to open sufficient locations to cover demand on all of the canals by the end of March 2013.

Boats that cruise and move (staying at a mooring for up to 5 days) will not require an Extended Mooring Permit or be in breach of the Bye-laws.

Waterways Ireland will continue to contact permit holders regularly to ensure they are kept up to date with the roll-out of the new permit. All queries about the enforcement of the current bye-laws or the Extended Mooring Permit should be directed to Shane Anderson, Assistant Inspector of Navigation: Tel no +353 (0)87 286 5726, Email shane.anderson@waterwaysireland.org.

These changes are necessary steps to improve the management of the canals and waterway amenities for both the navigational and recreational user, so that investment in the new infrastructure and facilities which Waterways Ireland has undertaken is maximised for every user.

Despite asking them several times, I still don’t understand what WI means by “permit” and “licence”. And now we have a “Permit licence”.

A Winn for the Grand

In today’s Sunday Business Post Jasper Winn, the paper’s Hardy Outdoor Correspondent, describes a five-day walk along the Grand Canal, from Harold’s Cross to Shannon Harbour. He did it in winter, camping out on the bank overnight despite its being so cold that the canal froze over, and finishing some of his days’ walks in the dark.

The SBP operates a paywall so you may not be able to see the page, but this is the link in case you want to try.

For the record

The Limerick Leader article about a proposed Limerick river bus has some statements that do not accord with my understanding.

The venture will see the river bus depart Guinness Pier – across from Athlunkard Boat Club at O’Dwyer Bridge – every two hours, bound for the power station […].

As far as I know, the pier in question was the Ranks jetty and was not used by Messrs Guinness. The Eclipse Flower, and other vessels owned by Ranks and their predecessors, sailed up the Shannon from there rather than attempt the stretch from Baal’s Bridge to Custom House Quay.

The boat will follow the route taken by barges of old – both passenger and commercial – some of which historically transported Guinness to the city up until the mid-1960s.

“It is a tried and tested route,” said Mr Flynn, stressing the viability and safety of the route, which passes Long Pavement – the edges of which have been repaired and grassed over – and finishes at the hydro-electric plant.

“Every passenger and commercial barge that came to Limerick for 50 years used that stretch of water. It is very safe. It was navigated by all the barges,” he said.

The route to Limerick through Ardnacrusha came into use only after the construction of the power station in the 1920s and was used for a little over thirty years. To the best of my knowledge, there were no passenger services in those years: passenger carrying stopped in the first half of the nineteenth century, when traffic was still using the old Limerick Navigation. There have been some trip-boats in recent years, but they did not (and do not) use “barges of old”. Some old barges, now converted and with more powerful engines, have safely navigated that stretch, but they do it when conditions are right.

During the final phases of Ardnacrusha’s construction, both old and new navigations were closed; the Grand Canal Company (GCC), the main commercial carrying company, ran to Killaloe and had its cargoes carried onward by rail to Limerick. When the new route through Ardnacrusha was opened, the GCC thought it was so dangerous that it refused to use it for about a year. It resumed operations only when a boom was put across the river above Baal’s Bridge and posts were provided upstream of O’Dwyer Bridge to which barges could tie while waiting for suitable states of the tide.

I accept that the proposed river bus will not be going downstream as far as Baal’s Bridge, but it will still be navigating on a stretch of water where Waterways Ireland advises that boats should not navigate when more than one turbine is running at Ardnacrusha. The ESB can run up to four turbines, each of which is said to add a knot to the current, and it can switch them on immediately, with no warning to any boat using the river.

Other pages on this site make it clear that I share the promoters’ enthusiasm for Ardnacrusha and the canal and river thence to Limerick. I do not say that the difficulties of that stretch cannot be overcome, but I do not think that they should be dismissed.

 

That Limerick “river bus” …

… from the (presumably artificially created) photograph in the Limerick Leader seems to be the Cailín Turána, formerly part of the Aran Islands Fast Ferries fleet at Doolin and seen here out of the water at Cork Dockyard in 2004. The vessel has not been on the Dept of Transport’s List of Certified Passenger Ships since 2007 (and may have come off the list before that: I have not kept copies of the lists earlier than 2007). It could of course have been used in Ireland for purposes other than carrying fare-paying passengers, or outside Ireland for any purpose, after 2004.

And it may be that the vessel shown in the photo is not that which is to be used in Limerick.