Tag Archives: Royal Canal

Royal water

The Royal Canal water supply applications have been approved by An Bord Pleanala. There were two separate applications [see here and here] but they were in effect treated as one. There are five PDFs available on each page and I haven’t read all of them yet. However, on a first glance, I note that:

2. The proposed development shall be operated as follows:

(a) Rates of abstraction from Lough Ennell to the Royal Canal shall be as specified  in the public notices and, in particular, shall not exceed 43,636 cubic metres of water in any 24 hour continuous period and subject to a total maximum abstraction of 6,586,363 cubic metres per annum.

(b) Abstraction from Lough Ennell to supply the Royal Canal shall cease when the  lake level reaches 79.325 mOD Malin Datum, being the crest level of Clonsingle weir, measured at Clonsingle weir by continuous monitoring.

(c) The fish pass at Clonsingle weir shall incorporate a minimum flow of 0.29m3/second.

(d) A minimum flow of 682 m3/day (0.5MGD), taken directly from Lough Owel, and excluding water from the fish farm, shall be retained in the original canal feeder.

Reason: In the interest of protecting the integrity of the Lough Ennell Special Area of Conservation and the ecological interest of the River Brosna and the canal feeder, and in the interest of protecting material assets at Lough Ennell and the River Brosna.

If I remember correctly, the amount of water available from Lough Ennell will not always provide enough (eg in a dry season) to keep the canal full. Still, this is a significant advance for Waterways Ireland and for Royal Canal enthusiasts.

WI canal permits

Latest update here. These are the main points.

Process

Applications for extended mooring permits at nine new locations will be available for two weeks from 19 November to 3 December 2012. The locations are Rathangan and Vicarstown on the Barrow Line (with a third stretch now at Vicarstown), two at Confey and one each at Cloondara and Lock 15 on the Royal and just one, Lock 34 to Griffith Bridge, on the Grand.

The schedule:

Applications for each set of locations are open for two weeks. Completed applications will be processed in order of receipt and mooring locations allocated. If availability exists after the application timeframe for a location has closed, late applications may be considered. Once all the extended mooring locations in an area have been allocated, no more extended mooring permits will be issued for that area in 2013. It is Waterways Ireland’s intention to complete the roll out of the extended mooring permit by March 2013.

That seems to be intended to get boaters to apply ASAP; otherwise they’ll be moored in the middle of nowhere for the rest of 2013.

The application process is set out in detail, with a new item.

From 16 November 2012 permits will no longer be issued by Lockkeepers, or the Eastern Regional Office. Permits will only be issued on completion of an application form submit to and processed by the Tullamore Office.

It is confirmed that applications must be accompanied by “copies of the insurance, and payment for the permit and a damage deposit”.

Downloads

There are four downloads: the application form [DOC] and a supplementary form for consortium members [also DOC], a sample 11-page EMP licence [not permit] agreement [PDF] and a 5-page guidance document [PDF]. A consortium is defined in the guidelines as a group of more than two people who own a single vessel. Owners of unpowered vessels are advised, but not required, to have insurance.

waste

The guidelines have a new item about disposing of rubbish:

Boat owners on the canals will be required to dispose of domestic rubbish at  their own expense. On the application form you need to indicate how you intend to manage this. For example, evidence of a paid collection service or by confirming that you will take your rubbish home and dispose of it through your domestic collection service.

In a limited number of locations Waterways Ireland may offer this service for a charge. Details of this will be notified when the area opens for extended mooring permit applications.

That is as I predicted in the last issue of Afloat.

And there is a paragraph about holding-tanks:

You are asked to tell us if your boat has an operational waste holding tank.  This is not a mandatory requirement, but information is being collected for management purposes.

The licence agreement says that owners have to clean up after dogs.

Here comes the BSC

From 2015 Waterways Ireland will be introducing the requirement for boats needing permits and wishing to use the canals to have a current hull survey to provide evidence that the boat is in good condition.

Not all boats will require this.

Your attention is being drawn to this requirement now to allow you time to prepare for 2015.

That’s from the guidelines document (join the queue now for the dry docks). And these bits are from the licence agreement:

The Licensee undertakes to have regular inspections of the gas and electric services of  his Boat as required to ensure these are kept in a safe and serviceable condition. […]

All Boats must carry adequate fire fighting equipment and have same serviced as per the manufacturer’s recommendations.

Insurance

The application form requires applicants to agree to this:

I/We hereby indemnify and shall keep indemnified Waterways Ireland from and against all actions proceedings costs claims demands and liabilities howsoever arising from my/our use of the facilities provided by Waterways Ireland on the Royal Canal, Grand Canal and Barrow Navigation and shall further indemnify and keep indemnified Waterways Ireland in respect of any accident, injury, loss or damage to any person or property howsoever arising including, without prejudice to the generality of the foregoing, where such accident injury loss or damage arises by reason of any matter or thing done or omitted to be done by me/us or person authorised by me/us or the purported exercise of such use.

I would welcome guidance on whether that might invalidate insurance policies.

Moorings are not transferable

If a Boat is sold it must be removed from the Mooring within seven days and the  Licensee must advise the Licensor’s Inspectorate. The new Boat owner will be required to make an application if they wish to avail of an extended mooring permit and Waterways Ireland will refund the balance pro rata of any fee paid for an extended mooring permit to the Boat owner less a fee of €50 to cover administration costs.

That’s from the draft licence.

Buy shares in Lowtown

Also from the draft licence.

It is not permitted to re-fuel Boats at an extended mooring.

Lots of exciting reading.

Spencer Dock

The Royal Canal meets the River Liffey at Spencer Dock (more or less: older OSI maps suggest that the section between Sheriff Street and the Liffey is Royal Canal Docks, with Spender Docks north of Sheriff Street). Much development has been proposed, and perhaps undertaken, in the area, where CIE (the public transport authority) owned much land.

Now, the Sunday Business Post tells us [perhaps behind a paywall], CIE’s subsidiary Irish Rail, which runs railways, is to sell land at Spencer Dock to a “private sector buyer”. The proceeds will enable Irish Rail to get rid of another 120 workers: it planned to lay off 300 workers this year but only 89 left because Irish Rail could not afford the terms of a voluntary redundancy scheme. The departures will reduce its wage bill.

I don’t really understand why CIE doesn’t simply shut down Irish Rail altogether, with the possible exception of the Dublin commuter services. Even its main-line trains are surely unnecessary now that most major conurbations are linked by motorways, on many (if not all) of which Bus Éireann, another subsidiary of CIE, runs express services. Lunatic ideas like the Western Rail Corridor don’t help, of course, but when, as the SBP reports,

[…] a train was recently left stranded in Galway after a local supplier refused to provide further credit […]

and when the company (again according to the SBP) cannot afford toilet rolls or receipt rolls for credit card machines, it may be that the market is trying to give the owners of the business a message: “close down now”.

 

Royal water

In April 2012 I wrote about the proposed supply of water from Lough Ennell to the Royal Canal. I said that

[…] the Lough Ennell proposal had to go to An Bord Pleanála. At any rate, two applications had to be made, one for the water abstraction and the other for the physical works. In practice, the two are being handled as one.

An Bord Pleanála asked Westmeath County Council for some more information; that has now been supplied and a decision is expected by 11 June 2012.

I have just checked An Bord Pleanála’s website for the two applications PW3005 (lodged 9 December 2011) and JA0030 (lodged 7 October 2011); both say:

Proposed decision date not available at this time.

I do not know why decisions are taking so long.

WI commercial operating licences

It’s getting hard to keep up with the amount of new regulatory information Waterways Ireland is producing (not that I’m complaining: it’s good that (a) systems exist and (b) information be made public). Today it has put up a page about commercial operating licences with downloadable PDFs for new applicants and for renewals.

WI says that

Waterways Ireland will give consideration to applications for permission to carry on commercial  operations on the waterways which would serve to encourage their use and contribute towards a vibrant waterway environment.

But getting a new licence is not easy. As well as describing the proposed business, you have to have registered the boat with WI and got a Passenger Certificate for from the Marine Surveyor’s office of the Department of Transport (which ain’t easy). If you want to sell alcohol, you have to have a Passenger Vessel
Licence from the Revenue Commissioners.

You have to provide a copy of your insurance policy:

Waterways Ireland requires that vessels carrying passengers hold adequate levels of insurance and appropriately indemnifies [sic] Waterways Ireland […].

And after that you have to show that your business has a chance of surviving:

Waterways Ireland is required to satisfy itself of the financial and economic standing of entities with whom it proposes to contract. In order to make this assessment, please provide relevant information such as recent accounts or Business Plan (including resources, financing, programme for delivery, target market, etc.).

And you have to supply a current Tax Clearance Certificate.

It seems that folk without capital (including working capital) need not apply.

More on WI and the canals

It says here:

A number of questions have been repeatedly posed since the initial communications about the Canal Bye-law Enforcement. These are listed below in the following categories. Click on the category to access the questions and answers.

Five downloadable PDFs on

 

Eeyore’s Gloomy Place

Here is an article, perhaps by Philip Dixon Hardy himself, from his Dublin Penny Journal of 1835. It is about the Bog of Allen, and the turfcutters living thereon, seen from the Grand Canal in 1835.

He visited a turfcutter’s hovel in the bog while stopped at a double lock about twenty miles from Dublin. What lock could that have been?

Note that Kildare is not among the counties mentioned in the article.

WI extended mooring permits

A Waterways Ireland press release has winged its way to my desk. If you want a permit (or licence?) you must provide a copy of your insurance and pay a damage deposit.

The full thing:

Waterways Ireland announced in June 2012 a change in the permit system allowing for year-long mooring permits on the Grand & Royal Canal and Barrow Navigation. The full list of Extended Mooring Locations has been published and is available on www.waterwaysireland.org, in the Canal Bye-Law Enforcement section.

The first four [for certain values of four. bjg] locations where the permits for extended mooring are being opened for application are Shannon Harbour on the Grand Canal, Rathangan and Vicarstown on the Barrow Line and Barrow Navigation, Clondra (East of Richmond Harbour), Confey and the 15th lock on the Royal Canal.

The application process for the Extended Mooring Permit for these locations will open on the 19th November and will remain open for 2 weeks. Boat owners with boats in the four locations with Combined Mooring and Passage Permits will be advised by letter. The Application Form and Guidance Notes for all applicants will be placed on www.waterwaysireland.org. The applicant is required to complete an application form, supply a copy of their insurance, certify that the boat complies with the byelaws and pay the €152 fee and a damage deposit of €250.

Permits will be allocated on a first come first served basis, so to receive a preferred location early applications are advised. Applications will only be accepted from owners already holding a valid annual Combined Mooring and Passage Permit. Boat owners without a Combined Mooring & Passage Permit who wish to apply for an Extended Mooring Permit can do so by ticking the box on the Extended Mooring Application Form and supplying the additional fee.

Applicants will be notified within 28 days of the success of their application.  Successful applicants will be required to sign the Extended Mooring Permit license and will then have a period in which to move to their new mooring. Enforcement of the 5 day rule will begin in this area following the issue of a Marine Notice.

Applications for the next set of Extended Mooring Locations will continue on a rolling basis thereafter with Waterways Ireland intention to open sufficient locations to cover demand on all of the canals by the end of March 2013.

Boats that cruise and move (staying at a mooring for up to 5 days) will not require an Extended Mooring Permit or be in breach of the Bye-laws.

Waterways Ireland will continue to contact permit holders regularly to ensure they are kept up to date with the roll-out of the new permit. All queries about the enforcement of the current bye-laws or the Extended Mooring Permit should be directed to Shane Anderson, Assistant Inspector of Navigation: Tel no +353 (0)87 286 5726, Email shane.anderson@waterwaysireland.org.

These changes are necessary steps to improve the management of the canals and waterway amenities for both the navigational and recreational user, so that investment in the new infrastructure and facilities which Waterways Ireland has undertaken is maximised for every user.

Despite asking them several times, I still don’t understand what WI means by “permit” and “licence”. And now we have a “Permit licence”.

Royal Canal traffic in 1844

Royal Canal traffic in 1844 (Salt)

That table is extracted from Samuel Salt’s Statistics and Calculations essentially necessary to persons connected with railways or canals; containing a variety of information not to be found elsewhere 2nd ed Effingham Wilson and Bradshaw & Blacklock, London 1846, available from Messrs Google here.

The interesting point is how little of the Royal’s traffic travelled the whole way from the Shannon to Dublin or vice versa: only about 5% of the Dublin-bound traffic and less than 3% of the traffic westward.

Another point of interest is that traffic to Dublin was three times the traffic from Dublin.

Amongst the livestock, pigs were the dominant animals: they lost too much condition if they were walked long distances, which was the only alternative to canal transport before the railways came. Even there, I suspect that much of the tonnage described as “from Longford and the Shannon” was actually from west of the river, in Counties Mayo and Roscommon.

Grand trumps Royal

A victory today for St James’s Hospital, close to the former harbour of the Grand Canal, over the Mater Hospital, close to the former harbour of the Royal Canal at the Broadstone.

Perhaps, if St James’s needs space to expand, it could take over the former canal harbour; work on its latest development seems to have ceased.