Category Archives: Engineering and construction

A use for the Royal

In an article on making use of the Royal Canal, I wrote:

[…] I am neither active in user groups nor a confidant of Waterways Ireland, so it is quite possible that folk have developed, or are developing, some plans to increase use of the Royal and Grand Canals (and the Barrow): plans that involve boats rather than, say, cyclists or walkers, who don’t actually need a functioning canal, just wayleaves and interesting artefacts to look at. I’d like to see such plans published on the Waterways Ireland website, but I haven’t found anything there.

But it seems that the cyclists may get in first. According to a report in today’s Irish Times [which may eventually disappear behind a paywall]:

Minister for Transport Leo Varadkar has instructed the National Roads Authority to examine possible routes for a cross-country cycle path from Dublin to Galway, similar to the award-winning Great Western Greenway in Co Mayo.

Mr Varadkar, who is also responsible for tourism and sport, said he wanted to secure funding for the project he predicted had the potential to bring in at least €15 million per annum. While a proposed route remained to be decided, the Royal Canal was an “obvious candidate” for the stretch outside Dublin from Mullingar to Maynooth, he said.

[…] Mr Varadkar said the proposed Galway-Dublin facility should be open to walkers as well as cyclists, like the Great Western Greenway.

Nothing wrong with any of that, of course. And perhaps walking and cycling routes could be developed in other ares, eg from Belturbet to Clones ….

Notice, by the way, that the news story mentions the National Roads Authority and the National Transport Authority. But which body is not mentioned?

Who fears to speak …?

I have long maintained that our knowledge of the history of the use of Irish inland waterways is woefully inadequate. Apart from the operations of the Grand Canal Company, we know little about boats, owners or traffic in the nineteenth century and almost nothing about earlier years. I am therefore delighted to have been sent an article by Malcolm Reynolds about a River Shannon vessel from the eighteenth century; it is available here.

Dublin’s City Bason in 1776

I have added this description, from Richard Twiss’s A Tour in Ireland in 1775 with a Map, and a View of the Salmon-Leap at Ballyshannon [London 1776] to my second page on the abandoned Main Line of the Grand Canal in Dublin:

The city bason is a reservoir, capable of holding water to supply the city for some weeks, when the springs from whence it is filled are dry; both the springs and the reservoir were dry whilst I was in Dublin. In 1765 a canal was begun to be cut from this place, and intended to be continued to Athlone, which is about seventy English miles off, in order to open a communication with the Shannon; at the rate the work is at present carried on it bids fair for being completed in three or four centuries.

The Underpants Gnomes and the Shincliffe Traveller

Here is an article from 1792 about the virtues of the River Shannon. It was written by an unidentified Traveller from Shincliffe, near Durham. It is interesting as an earlyish example of the Irish waterways cargo cult which, it has been pointed out to me, resembles the business plan of the underpants gnomes.

Low water levels …

… on the Mississippi.

Maybe we could sell them some from the Shannon.

Buggering up the Barrow

In February 2012 Waterways Ireland published a study of the River Barrow called The Barrow Corridor Recreational, Tourism and Commercial Product Identification Study. I’ve devoted a lot of time to the document and I confess that, although I’m in favour of WI’s conducting these studies, I found this one rather disappointing. The principal problem, as I see it, is that the document just doesn’t hang together: it is not clear how the recommendations derive from the analysis. I also thought that its recommendations on navigation were weak, suggesting a fundamental misunderstanding of the nature of the Barrow.

I haven’t finished putting my thoughts on the subject together because I want to do the study justice, but I have put up six pages about the report, linked from an overview page here. I need to give the navigation page a little more thought; when it’s finished I’ll link it to the overview page and mention the matter here.

Bring back the Black

The Black Bridge at Plassey has been closed since the floods of November 2009. Its reopening seems to have a low priority; I suspect that is because the importance of the bridge in Ireland’s technological, economic, entrepreneurial and political history is not widely appreciated. Here is a page explaining some of the background and suggesting a context within which reopening might be justifiable.

Dry docks

Waterways Ireland has a new web page up about the conditions under which it will allow its dry docks to be used. The page includes links to a downloadable MS Word application form and a PDF. Anyone applying to use a dry dock must now submit:

  • a completed application form
  • a letter from an insurance company confirming that the owner has adequate insurance in place [sic] to bring vessel into a dry dock for works
  • a letter from the insurance company of any third party contractors to be employed confirming they have adequate insurance in place [sic] to carry out the proposed works
  • the relevant payment for number of days usage booked
  • a security deposit payment of €250
  • a shoring/propping certificate
  • a method statement of work to be carried out
  • a safety statement for work to be carried out.

In April 2012 I discussed the issues here.

My page about dry docks is here.

Marl update

I have added more information, from Arthur Young in 1780, to my piece on dredging for marl on Lough Derg. Young provides a few more details on the process.

Sallins

On 8 August 2012 Waterways Ireland applied to Kildare County Council for planning permission for a development at Sallins:

The construction of a new 210m fixed timber house boat mooring facility for 12 boats with electric and water service supply bollards, 45m of a fixed timber short term mooring facility, car parking bays for 12 cars, access pathway suitable for disabled access, and a sewage pumpout for boats.

The application is at pre-validation stage. Submissions are to be made by 11 September and the “due date” is 2 October 2012. The file number is 12645. I can find no additional documents or details.

To see the application, go to this page and install the download before clicking on “Link to Full Planning Enquiry System”. Cookies will have to be enabled.

IRBOA doesn’t seem to have the news on its site yet, but it is interesting to compare the current proposal with what was discussed at the IRBOA meeting in Sallins on 8 March [2011, I think].