Category Archives: Operations

MCIB kicks ass

Marine Casualty Investigation Board report Investigation into the loss of the Sail Training Passenger Vessel STV Astrid on 24th July 2013 PDF here. Very long but, apart from the photos, the meat is in the first part. At the end you can read angry letters from Dutch authorities.

Update

Direct link amended, but just in case here’s a link to the page on which you click to download. And in case that falls over, here’s the page listing all MCIB reports and here’s the MCIB home page.

A quick bit of sheughery

Here, read this. I haven’t time to take it all in at the moment, but the minister’s “An updated business case was recently completed for my Department” is, as far as I know, misleading: that business case was completed by DCAL in Northern Ireland and sent to Dublin. Thus, as the SF TD Mr Ó Snodaigh probably knows, the “business case” (which is not a cost-benefit analysis) came from a Sinn Féin minister’s department.

It seems our designation of “Saunderson’s Sheugh” was spot on.

Northern Ireland spending on waterways

Sammy Wilson [DUP]: Looking through the list of capital projects, I see lock gates on the Shannon, bridge repairs on the Grand canal, enhancements of the Grand canal towpath, the Shannon Blueway and the multi-activity trail at Carrick-on-Shannon. Nearly every one of these projects is in the Irish Republic. Does the Minister see her role as fighting for projects in Northern Ireland or simply sitting there, handing over our money for projects in the Irish Republic?

Mr Wilson might not have noticed, during his terms in ministerial office, that waterways capital projects in each jurisdiction are paid for by the government of that jurisdiction. So NI money is not spent on capital projects in the republic; if NI politicians want more money spent on waterways improvements [as opposed to running costs] in Northern Ireland, it will have to come from the NI budget.

Unfortunately Mr Wilson’s party colleague, and successor as Minister of Finance and Personnel, Simon Hamilton, does not share Mr Wilson’s enthusiasm for erecting lock gates or towing-paths on the Erne [or whatever it was he wanted], for he has cut DCAL’s Budget [157-page NI budget and 28-page statement, both PDFs] and, in consequence, the amounts to be allocated to Waterways Ireland.

DCAL is wondering how to apply the chopper and is seeking views; a 190-page consultation document can be downloaded here [MS Word *.doc]. Neither DFP nor DCAL makes it easy to find the change from last year’s allocations, but DCAL says that the “savings” to be made by Waterways Ireland will be £468,000. As of today, that’s €630,727.

The Word document points out that

The budgets for the North/South Bodies are agreed by the North South Ministerial Council and are dealt with under different arrangements.  They are therefore outside the scope of this exercise.

So the document can’t say what the “front-line impact” of the cuts to Waterways Ireland’s allocation will be.

15% of WI’s current budget is paid by Northern Ireland and 85% by the republic. If the savings shown above are all to the current budget [which is not clear, though WI’s NI capital budget was pretty small anyway], then the total cut in WI’s current spending will be €5,204,847.

Note again that, without spending a lot more time on this than I currently have available, I cannot say from what base figure the cuts or savings are to be made.

Respondents to DCAL’s November 2014 consultation on the draft budget included only one who discussed waterways:

There was one response who stated that other sectors should be cut and funding to Waterways Ireland should be increased.

That was from an individual; it appears that no organisations commented on waterways issues and I cannot see any inland waterways-related voluntary body listed amongst those who submitted their views. As in the republic, arts folk seem to have been well organised.

The DCAL page contains a link to a surveymonkey page seeking responses.

 

Cycling the MGWR

From Michael Geraghty:

There is a photography exhibition currently running at the National Photographic Archive in Temple Bar’s Meeting House Square called Midland – Lár Tíre: Cycling the MGWR from past to present and features photographs along the 1,000km old Midland Great Western Railway (MGWR) network. The photographer, Pamela De Brí (my sister), cycled the 1,000km and recorded her journey as photographs and audio tapes.

The exhibition will run until Sunday 24 May 2015 and here is a link to an article on the Journal.ie.

The history of the MGWR is linked to that of Irish waterways more closely than, I think, that of any other Irish railway.

Outbreak of sanity in Co Westmeath

Our big thing is to link the Galway Dublin cycleway into Kilbeggan and along the stretch of the old canal to Ballycommon. That’s around a million euro project and the biggest thing in our Vision for Kilbeggan plan.

Thus Dan Scally of Renew Kilbeggan in the Westmeath Examiner.

Canals conference 7 March 2015

Information posted at the request of the organisers


Inland Navigations of Ireland Historical Society
in partnership with
The Heritage Boat Association

The Canals of Ireland

Saturday 7 March 2015

Hugh Lynch’s Function Room, Tullamore, Co Offaly

Programme

Memorial Slides Conor Nolan 09.30
Welcome Gerard Bayly 09.55
Session 1 Chairperson Judie Lambert
The Canals of Europe Mike & Rosaleen Miller 10.00
The Canals of Ireland Colin Becker 10.20
Coffee break 10.40
Saving the Royal Niall Galway 11.00
Fighting for the Grand Mick Kinahan 11.20
Living on a Canal Eric Kemp 11.40
Morning Question Time 12.00
Lunch break 12.30
Session 2 Chairperson Kristina Baker Kenny
Newry Canal Geraldine Foley 13.30
Limerick Navigation Raymie O’Halloran 13.50
John’s River Brian Simpson 14.10
Grand Canal Kilbeggan Branch James Scully 14.30
Boyne Navigation Seamus Costello 14.50
Coffee break 15.10
The Future Joe Treacy 15.25
The Future Brian J Goggin 15.45
The Future Nigel Russell 16.05
Evening Question Time 16.25

 

Details

Admission:                          €12
Breaks:                                Tea/coffee included
Lunch in room:                   Soup and sandwiches included
Music:                                 Live music session during lunch
HBA:                                   Merchandise for sale
IWAI:                                  Merchandise for sale
Authors:                              Books for sale

Directions

Hugh Lynch’s Pub, Kilbride Street, Tullamore, Co. Offaly

087 250 5422

 

Politician asks sensible question shock

The invaluable KildareStreet.com tells us of this written Dáil question and answer on 4 February 2015:

Martin Heydon [FG, Kildare South]: To ask the Minister for Arts, Heritage and the Gaeltacht if her attention has been drawn to concerns regarding the lack of dredging on the lateral canals of the River Barrow and overgrown vegetation which is making navigation difficult; her plans to improve this situation; and if she will make a statement on the matter.

The lateral canal at Ardree on the Barrow

The lateral canal at Ardree on the Barrow [OSI ~1840]

Heather Humphreys [FG, Clones Sheugh]: I am advised by Waterways Ireland that, as the Barrow Navigation is wholly situated within the River Barrow and River Nore Special Area of Conservation (SAC), due regard must be given to the provisions of the EC (Birds and Natural Habitats) Regulations 2011. These require a rigorous assessment to be carried out to assess the impacts of any work on the protected species and habitats, prior to any works being undertaken.

If the impacts cannot be screened out and a Stage II assessment is required, a full planning application must be made. In addition, the Fisheries Consolidation Act 1959 (as amended) prohibits any in-stream works, such as dredging, during the spawning season from October to June.

I am informed by Waterways Ireland that dredging on the lateral canals of the Barrow Navigation was historically done during the winter months but that this is not now possible. However, Waterways Ireland is working with Inland Fisheries Ireland to formulate procedures which would allow work to be carried out in accordance with the relevant legislation. In addition, Waterways Ireland is continuing to work with all relevant agencies to ensure that as much work as possible is carried out on the Barrow within the time constraints which exist.

I have been assured by Waterways Ireland that it remains fully committed to the development of the Barrow Navigation in line with its statutory remit.

This question produced useful information, whereas some TDs seem to ask questions only as a way of assuring their constituents of their undying love and devotion. See, for instance, Brendan Smith, who has asked the same question at least three times.

Note that the short dredging season presumably applies to other rivers that are within SACs, such as the River Shannon at Plassey.

My OSI logo and permit number for website

Irish GIS data

Not good enough, it seems: the Ardnacrusha headrace and tailrace are missing.

The Corrib dredger

Drainage and Navigation Works: Construction of dredging machinery

The Commissioners having authorized the purchase of one of the iron dredgers used in the execution of the Shannon works, and then on that river at Athlone, the operation of removing her to Galway was commenced on 1st of March.

This was effected by first clearing her of all machinery, and then cutting up the hull or shell into pieces suited for carriage by land, in which manner every portion of her was removed to Galway.

In reconstructing this boat, considerable improvement and thorough repairs have been effected. A flat iron plate, three-fourths of an inch thick, has been substituted for the hollow iron keel, which lightens her draft of water five inches without any diminution of her steadiness, and an alteration of the position of the steam-pipes has been judiciously arranged. The keelsons were pieced, and whenever any materials were unsound they have been replaced.

The time occupied in the breaking up, transfer, and reconstruction of this dreder, weighing 200 tons, was five months and eleven days, and the whole work was executed at a cost of £803/8/11.

Four scows or decked barges have been constructed for the conveyance of the material raised by the dredger to spoil. Two of these boats are capable of carrying 30 tons, and the other two 45 tons.

Extract from the Annual Report of Mr S U Roberts CE, District Engineer for the year 1851 in Twentieth Report of the Commissioners of Public Works 1852

The Deel navigation

The Deel linked the Co Limerick town of Askeaton to the south side of the Shannon Estuary. Here is a page about the navigation and some of its quays. Note that it is a long page with many maps and photos, although they’re all reduced in size to minimise the strain on tinterweb.